Crystal Creek Module - Progress Report - 2005-06 Report
06/08/2005
06/08/2005
The first piece of rail has been glued to the ties (I used 5-minute epoxy instead of using spikes). The photo shows my home-made rail gauge blocks upon which I could place the metal weights to hold the track in gauge and down while the glue sets. Rail feeder wire is always soldered to the bottom of each piece of rail before the rail is glued to the layout.
2005-06 Report