P & C Railroad Version 3 - Progress Report - 2002-06 Report
06/11/2002
06/11/2002
I finished applying ballast to the rest of the last bit of main line that I finished (the section in between the two rivers). This section is where the helix will connect to, so it needed to be finished. I installed a spur in the back. The unused turnout in the front is where the helix will connect.
2002-06 Report
I scratchbuilt a center board walk in between the tracks in the bridge.
2002-06 Report