PMRR Hazel Mine
Temporary Notes
01/15/2017
Notes about why I am starting over.
Introduction
01/15/2017
My high-level objective with this layout.
Prototype Research
01/15/2017
Prototype information about the Hazel Mine.
Layout Design
03/10/2017
How I plan on implementing the prototype layout.
Layout Room
01/15/2017
The room in which the layout is currently set up.
Framework
01/15/2017
Building the sectional framework.
Track
01/15/2017
Hand-laying track.
Scenery
01/15/2017
Basic scenery construction.
Structures
01/15/2017
The structures built for the layout.
Scenery Detailing
01/15/2017
Super-detailing all of the layout.
Accomplished
03/10/2017
What I have accomplished so far.
To-do List
02/04/2017
What is still on my to-do list.