Magazine:
NASG Dispatch 2025 #3 May
Page:
14
The author visited and documents the 960sqft layout owned by Bob and Debbie Guckian. Bob's basement-filling layout consisted of three loops, capable of running five trains simultaneously, complete with camera monitoring. Several layout photos are included. Bob passed away in 2023, and the layout is no more.
Magazine:
S Gaugian 2008-03/04
Page:
30
Category:
Electronics
Scale:
S
The author describes how the club bought and installed a Programmable Logic Controller to run the eight accessories on their 32' x 20' club layout.